The Challenge
What needed to change.
A manufacturer struggled to launch a new aerospace component on schedule. Late-stage design changes, missed supplier handoffs, and a weak prototype-to-production transition put a critical contract at risk:
- Late-stage design changes disrupting the production ramp
- Missed supplier handoffs slowing the transition to production
- A weak prototype-to-production transition with limited design-for-manufacture readiness
- Risk of losing a key contract due to schedule delays
The Fulcrum Approach
How we solved it.
Fulcrum created a structured framework to accelerate new product introduction and protect the contract schedule through disciplined program and product controls.
- Introduced a stage-gate NPI process with clear entry and exit criteria at each phase, from concept through full-rate production
- Implemented concurrent engineering by engaging design, manufacturing, quality, and supply chain teams early
- Conducted supplier readiness reviews, verifying tooling, training, and capacity before parts were released to production
- Applied rapid prototyping and iterative testing to validate designs earlier and identify issues before they impacted production
- Established integrated program reviews to track NPI progress against milestones, surfacing risks early
- Leveraged lessons learned from prior NPIs to build a knowledge base, reducing ramp-up time
Impact Delivered
Results that matter.
Outcome
NPI cycle time cut by 25%
Outcome
Improved first-pass yield at launch
Outcome
Customer delivery schedule met for contract award
Outcome
Strengthened collaboration across engineering and operations
The new product launched on time and on quality, securing future program revenue.